The Novo Tempo Thermal Power Plant is located in the industrial area of Vila do Conde port in Barcarena in the Amazon Region and has an installed capacity of 1,607 MW. It includes a gas pipeline and storage and regasification terminal with capacity to produce about 15 million m³ of gas per day. The LNG comes from Storage and Regasification Vessels (FSRUs). A 1.5 Km. 18″ gas pipeline interconnects the regasification terminal to the power plant.
JGP was responsible for obtaining the PHASE 1 Environmental Installation Permit of the project. Scope of work included detailing of the E&S Management Plans (ESMP), the report on compliance with the conditions of the Preliminary License and the preparation of malaria risk assessment and Malaria Control Action Plan (MCAP).